home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_1 / V11_121.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  11KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/cZx=0di00VcJAN804Z>;
  5.           Wed,  7 Mar 90 01:54:35 -0500 (EST)
  6. Message-ID: <8Zx=0C200VcJ8N6E5j@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Wed,  7 Mar 90 01:54:06 -0500 (EST)
  11. Subject: SPACE Digest V11 #121
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 121
  14.  
  15. Today's Topics:
  16.               SR-71 on CNN Headline News
  17.     Re: Magellan Update - 03/02/90 -- now reprogramming spacecraft
  18.                  EMP
  19.        Challenger's Last Words & Galileo Camera 'Blemishes' #2
  20.               Ulysses Update - 03/06/90
  21.                Re: More info on Pegasus
  22. ----------------------------------------------------------------------
  23.  
  24. Date: 6 Mar 90 14:34:26 GMT
  25. From: bbn.com!djw@bbn.com  (David Waitzman)
  26. Subject: SR-71 on CNN Headline News
  27.  
  28. Last night I saw a short piece on the SR-71 retirement on CNN Headline
  29. News.  While it didn't really offer any new news, the in-flight videos
  30. were really cool.
  31.  
  32. ------------------------------
  33.  
  34. Date: 6 Mar 90 12:46:00 GMT
  35. From: unmvax!nmtsun!nraoaoc@ucbvax.Berkeley.EDU  (Daniel Briggs)
  36. Subject: Re: Magellan Update - 03/02/90 -- now reprogramming spacecraft
  37.  
  38. In article <25554@ut-emx.UUCP> anita@ut-emx.UUCP (Anita Cochran) writes:
  39. >
  40. >As an example, I am involved with the Comet Rendezvous/Asteroid Flyby (CRAF)
  41. >mission.  If we decided one day that we want to point to a particular
  42. >feature on the comet and cycle through 5 filters, it will be a minimum
  43. >of 4 weeks from the time we request it until the time it is uplinked
  44. >and executed.  Obviously, this takes away sponteneity!  First and
  45. >foremost is spacecraft safety.  We scientists are trying to shorten
  46. >the time but we are not winning the battle.
  47.  
  48. Wow, that is a long time.  Is that number longer than some of the previous
  49. missions?  In particular, I am certain that during Voyager II's encounter
  50. with Neptune, mission scientists were able to target particular features of
  51. Neptune in under a few days.  At least some of these (eg. the scooter), were
  52. not visible until the spacecraft was very close to the planet, and several
  53. frames were centered right on it.  Indeed, there was a good deal of anxiety
  54. in predicting its position, since they had only a few previous frames to work
  55. with, and they weren't completely certain that they could hit it.  At the
  56. time, I had the vague impression that this was all coming from some sort of
  57. discretionary imaging time budget.  Is there some means whereby you can
  58. declare an "unspecified" image on CRAF, perhaps within some other mission
  59. constraints.  (Say, that you can't move the filter wheel, and that the
  60. instrument must point within epsilon of some point.)
  61.  
  62. I think that most of the earth orbiting observatories have some mechanism
  63. similar to what I describe.  (I'm pretty sure that IUE does, and I think that
  64. Hubble does too.)  If memory serves regarding Hubble, there is a mode where
  65. you can send _very limited_ real time commands to it.  (Basically to select
  66. one of several prepared branches in your observing schedule.)  This in
  67. principle would let you select between different instruments or between
  68. several very closely spaced targets based on the feedback you get from the
  69. real time monitoring of your program.  I grant you that this flexibility is
  70. pretty hard to reconcile with a scheduling program that can _barely_ run
  71. faster than real time, but I think it's true.  Any STSI people want to
  72. correct me?
  73.  
  74. -----
  75. This is a shared guest account, please send replies to
  76. dbriggs@nrao.edu (Internet)
  77. Dan Briggs / NRAO / P.O. Box O / Socorro, NM / 87801  (U.S. Snail)
  78.  
  79. ------------------------------
  80.  
  81. Date: 6 Mar 90 17:58:49 GMT
  82. From: zaphod.mps.ohio-state.edu!samsung!aplcen!stda.jhuapl.edu!jwm@tut.cis.ohio-state.edu  (Jim Meritt)
  83. Subject: EMP
  84.  
  85. In article <10597@hoptoad.uucp> tim@hoptoad.UUCP (Tim Maroney) writes:
  86. }It would also take a pretty large hydrocarbon explosion to create EMP.
  87.  
  88. accidently.
  89.  
  90. If you are trying, it doesn't.  You do have to doctor the charge a bit, though.
  91.  
  92.  
  93. "In these matters the only certainty is that nothing is certain"
  94.                     - Pliny the Elder
  95. These were the opinions of :
  96. jwm@aplcen.apl.jhu.edu  - or - jwm@aplvax.uucp  - or - meritt%aplvm.BITNET
  97.  
  98. ------------------------------
  99.  
  100. Date: Tue, 6 Mar 90 14:55:09 +0100
  101. From: mpirbn!u515dfi@relay.EU.net (Daniel Fischer)
  102. Subject: Challenger's Last Words & Galileo Camera 'Blemishes' #2
  103.  
  104. Chris Jones and Scott Brown write:
  105. >...I don't feel a need to know all the lurid details of the tragedy.
  106. >...There is no need to know this ...too personnal to be open for public 
  107. >observation. Just my opinion...
  108. Right when it comes to discuss what happened in the crew compartment prior to
  109. impact on the Atlantic. But there's also the technical side of this drama:
  110. I still recall how shocked I was when I first realized on the video footage
  111. of the accident that the front part of the orbiter emerged from the explosion
  112. in *one* part. And months later I heard that it most likely survived airtight!
  113. I've never heard anyone mentioning whether it would have been possible to add
  114. a parachute system that would have allowed a survivable landing? Why does it 
  115. seem to be so difficult to build such a system, that even the designers of the
  116. Hermes space shuttle finally decided to abandon the idea to save the crew cabin
  117. as a whole, in favor of simple(?) ejection seats? Is it correct that such a
  118. system was once installed in a U.S. bomber but failed completely in the first
  119. *real* accident? Can somebody give me details about this incident?
  120.  
  121. --- The following item was to appear in SPACE Digest Vol.11 Issue 76, but
  122. several subscribers received this issue in a scrambled form. Here it's again ---
  123.  
  124. The Venus shot by the Galileo spacecraft in Av.Week 19 Feb. p.25 shows
  125. "several ring-shaped shadows" - who knows what precisely has caused them?
  126. I recall the same phenomenon from Viking Orbiter pictures and from Voyager 2's
  127. camera. In the latter case the rings were seen only in highly enhanced images
  128. (like of Uranus' disk), but the defective Galileo frame doesn't look much
  129. processed. 
  130.   Will it be possible to suppress these "blemishes" (AW&ST) by use of a
  131. suitable flatfield or will they spoil every Galileo picture ? I was always a
  132. bit scared by the fact that there's just   o n e   camera going on this big
  133. journey, compared to the 4 cameras on the two Voyagers.
  134.  
  135.    Daniel Fischer, Max Pl. Inst. Radioastron., FRG   [u515dfi@mpifr-bonn.mpg.de]
  136.  
  137. ------------------------------
  138.  
  139. Date: 6 Mar 90 17:16:55 GMT
  140. From: elroy.jpl.nasa.gov!forsight!jato!mars.jpl.nasa.gov!baalke@cs.ucla.edu  (Ron Baalke)
  141. Subject: Ulysses Update - 03/06/90
  142.  
  143.  
  144.  
  145.                               Ulysses
  146.                        Mission Readiness Test
  147.                            March 6, 1990
  148.  
  149.      Ulysses is a joint mission carried out by NASA and the European Space
  150. Agency (ESA). The primary objectives of the Ulysses mission are to
  151. investigate, as a function of solar latitude, the properties of the solar
  152. wind, the solar corona, the sun-wind interface, the heliospheric magnetic
  153. field, solar radio bursts and plasma waves, and interstellar/interplanetary
  154. neutral gas and dust. The secondary objectives of Ulysses includes the
  155. measurements of the Jovian magnetosphere during the Jupiter flyby phase,
  156. and detection of cosmic gamma ray bursts and gravitational wave measurements.
  157.  
  158.      Ulysses is to be launched by the Space Shuttle in October 1990. Using
  159. a two-stage IUS solid-rocket motor in combination with a Payload Assist
  160. Module (PAM-S) kick stage, Ulyssses will be injected into a direct
  161. Earth-Jupiter transfer orbit. Ulysses will arrive at Jupiter in March 1992.
  162. It is interesting to point out that Ulysses will arrive at Jupiter before
  163. Galileo. At this point, the Jovian gravitational field will deflect the Ulysses
  164. spacecraft into a high-inclination orbit south of the ecliptic plane.  The
  165. out-of-ecliptic orbit has an aphelion of 5 AU and a perihelion of 1.5 AU.
  166. About 46 months after launch, Ulysses will pass under the southern pole of
  167. the Sun at a distance of 2.3 AU. Ulysses will then proceed to pass over
  168. the northern pole a year later. The Ulysses mission will end in September
  169. 1995.
  170.  
  171.      The Ulysses's Mission Readiness Test (MRT) so far has been successful.
  172. All objectives for telemetry, tracking, command and monitor data types
  173. were met. Command data transfers were accomplished by JPL's Network
  174. Operations Control Center (NOCC) and Mission Control and Computing Center
  175. (MCCC). S and X bank tracking data was validated by NOCC displays.A S band
  176. uplink sweep was performed followed by S and X band ranging exercises. The
  177. Telemetry Simulation Assembly (TSA) was configured standalone and all bit
  178. rates for both S and X band were validated with no problems.
  179.  
  180.                     Key Dates for Ulysses
  181.  
  182.              10/05/90 - Launch from Space Shuttle
  183.              12/30/90 - First Opposition
  184.              08/24/91 - First Conjunction
  185.              02/01/92 - Second Opposition
  186.              03/11/92 - Jupiter Closest Approach
  187.              09/07/92 - Second Conjuction
  188.              03/03/93 - Third Opposition
  189.              05/29/94 - Beginning of First Solar Pass
  190.              08/28/94 - End of First Solar Pass
  191.              02/05/95 - Perihelion
  192.              05/29/95 - Beginning of Second Solar Pass
  193.              09/11/95 - End of Second Solar Pass
  194.              09/30/95 - End of Mission
  195.  
  196.  
  197.  Ron Baalke                       |    baalke@mars.jpl.nasa.gov 
  198.  Jet Propulsion Lab  M/S 301-355  |    baalke@jems.jpl.nasa.gov 
  199.  4800 Oak Grove Dr.               |
  200.  Pasadena, CA 91109               |
  201.  
  202. ------------------------------
  203.  
  204. Date: 6 Mar 90 15:10:59 GMT
  205. From: samsung!umich!sharkey!amara!khai@think.com  (S. Khai Mong)
  206. Subject: Re: More info on Pegasus
  207.  
  208. In article <1990Mar6.111802.8379@agate.berkeley.edu> 
  209.     gwh@headcrash.Berkeley.EDU (George William Herbert) writes:
  210. #>   on the rocket], at about 950 lbs/ft^2 force.  After 81 seconds, the
  211. #>first stage burns out and seperates.  At this point, the rocket is at
  212. #>208,000 feet and moving at mach 8.7.
  213. #>   The second stage is controled by a cold-gas reaction control system
  214. #>which takes over immediately after the first stage seperates.  At 87 seconds
  215. #>into the flight, the third stage ignites, thrusting at an angle of 26
  216. #>degrees above the horizon.  At this point the craft is at 231,000 feet
  217. #>altitude.  At the 120 second mark the payload fairing seperates from
  218. #>the craft.  At 159 seconds the second stage burns out, with the craft
  219. #>at 552,000 feet and 17,800fps velocity.  It is oriented 18.4 degrees
  220. #>above the horizon.
  221. #>. . . 
  222. #>   an angle of 1.9 degrees to the horizon.  At this point the third
  223. #>stage ignites, and burns until 533 seconds, at which point the
  224. #>spacecraft is at 250 miles and 25,000fps velocity [orbital velocity].
  225.  
  226. Is something wrong with the description of the stage firing timing
  227. descriptions?
  228.  
  229.  
  230.  
  231. --
  232. Sao Khai Mong:   Applied Dynamics, 3800 Stone School Road, Ann Arbor, Mi48108
  233. (313)973-1300 (uunet|sharkey)!amara!khai  khai%amara.uucp@mailgw.cc.umich.edu
  234.  
  235. ------------------------------
  236.  
  237. End of SPACE Digest V11 #121
  238. *******************
  239.